Energy consulting for apartment buildings
A more efficient building is worth more.
I support apartment buildings from the analysis of their energy use all the way to the finished works: solutions chosen on the numbers, with no ties to suppliers or contractors.

The three questions that matter
How much do we invest?
A clear, transparent estimate of the costs.
How much do we save each year?
A real reduction in energy use and bills.
How long until the investment pays back?
A clear assessment of the payback period.
Only the building's interest counts: no ties to suppliers or contractors.
Heat pumps, hybrid systems, photovoltaics, storage: the choice comes after the analysis, not before.
Every measure weighs cost, expected savings and payback time.


The method
From analysis to completed works, one step at a time
The process is split into modules. After each phase the owners' meeting decides, with the figures in hand: the building only commits to the next step.
MODULE EF
Analysis and study
Energy use, systems, possible solutions, market check and economic assessment.Details →
OWNERS' MEETING 1
Decide whether to proceed
Results presented to the building manager and the owners.
MODULE M1
Tender and selection
Specification, tender, negotiation; finalised offer and selection of the proposed contractor.Details →
OWNERS' MEETING 2
Approval
Presentation of the selected contractor and offer, and of the final cost breakdown of the project.
MODULE M2
Implementation
Award of the contract to the selected company, coordination of the works, on-site checks, acceptance testing and commissioning.Details →
The first step
The energy analysis of the building (Module EF)
A technical and economic study of the entire energy system, to identify measures that are feasible and affordable. Fixed lump-sum fee, agreed in advance; delivery within three months of receiving the documents.
EF1 · Current situationDocuments, site visit, energy use and costs, building and systems, critical issues.
EF2 · SolutionsCoordinated preliminary sizing of boilers, heat pumps, photovoltaics and storage; simulation of energy use day by day and season by season.
EF3 · Market checkPreliminary quotes from specialised contractors, to confirm and fine-tune the solution.
EF4 · Final reportInvestment, savings, incentives and payback times, presented to the building manager and the owners' meeting.
To get started, all you need is the EF01 form: a few details about the building, used to prepare a tailored quote. Download it and send it here →
← Back to the method
After owners' meeting 1
Tender and contractor selection (Module M1)
From the outline design to the choice of contractor: comparable quotes on the same basis, and a decision taken with the figures in hand. Module M1 can follow Module EF or be commissioned on its own, if the available technical documentation is sufficient.
M1.1 · Technical specificationPreparation of the technical specification and tender documents, based on the EF study or on the available design.
M1.2 · Selection of contractorsIdentification of qualified contractors to invite and request for quotes, all based on the same specification.
M1.3 · Managing the tenderTechnical contact with the contractors, clarifications, regular updates to the building manager; analysis and comparison of the final quotes.
M1.4 · Selection of the contractorTechnical and commercial negotiation, finalisation of the offer and selection of the proposed contractor, to be presented at owners' meeting 2 with the final cost breakdown.
The result: a finalised offer and a selected contractor, to be presented at owners' meeting 2 with the final cost breakdown of the project. The contract is awarded only after the owners' meeting has approved it. ← Back to the method
After owners' meeting 2
Implementation (Module M2)
From the start of works to commissioning: an engineer on the owners' side, checking that the system is built as planned, on time and on budget.
M2.1 · Contract award and start of worksAward of the contract to the selected company, start of the works and coordination between contractor, building manager and owners.
M2.2 · Design reviewChecking that the detailed design prepared by the contractor is consistent with the specification and the contract.
M2.3 · Site supervisionScheduled site visits, progress monitoring, technical handling of changes and deviations, updates to the owners.
M2.4 · Acceptance and handoverFinal inspection of the system and its documentation; support at handover and commissioning.
The detailed design remains the responsibility of the contractor or its designer: Module M2 checks that it matches what was agreed. ← Back to the method
Why a consultant
Three quotes are not enough
Every contractor proposes its own system. With a single specification, the bids can be compared on the same basis.
Boilers, heat pumps, photovoltaics and storage have to be sized together: that is where the savings come from.
The building manager runs the building; the consultant brings the technical support needed to make good decisions.
My job is to put clear figures on the table. The decision always rests with the owners.
About me
Ing. Roberto de Zuani
Aerospace engineer (Sapienza University, Rome), licensed to practise as an engineer in Italy since 1993.
For more than twenty years I have worked in industry, in Italy and Germany, on thermal management, air-conditioning and power electronics, following projects for major European manufacturers from the first quote to series production.
I follow the market for photovoltaics, heat pumps and hybrid systems closely: I know how to request quotes from contractors and how to compare them.
For much of my career I was on the side of those who write the offers: I know how a quote is built, where the margins are hidden and which questions to ask to genuinely compare different proposals. Today I put that experience at the service of apartment buildings – on the client's side.
I handle every assignment personally: analysis, selection of contractors, negotiation, supervision of the works through to final acceptance. I work in Italian, German and English.
Experience and method at the service of your building.
Contact
Let's talk about your building
Building managers and owners' committee members are welcome to contact me for an initial assessment of the building.
Fill in only the details you have to hand (for the rest, simply write "Not known") and attach it to your request. Filling it in is not an engagement: it is only used to prepare the quote. The form is in Italian – I am happy to go through it with you.