Logo Ing. R. de Zuani Ing. R. de ZuaniBuilding services & energy efficiency
Logo Ing. R. de Zuani – building services and energy efficiency

Energy consulting for apartment buildings

A more efficient building is worth more.

I support apartment buildings from the analysis of their energy use all the way to the finished works: solutions chosen on the numbers, with no ties to suppliers or contractors.

Lower consumption, higher value for your building

The three questions that matter

1

How much do we invest?

A clear, transparent estimate of the costs.

2

How much do we save each year?

A real reduction in energy use and bills.

3

How long until the investment pays back?

A clear assessment of the payback period.

Independent advice

Only the building's interest counts: no ties to suppliers or contractors.

No technology taken for granted

Heat pumps, hybrid systems, photovoltaics, storage: the choice comes after the analysis, not before.

Investing well, not just spending

Every measure weighs cost, expected savings and payback time.

Rooftop photovoltaic system
Photovoltaics and storageEnergy produced on the roof, used by the building.
Heat pumps installed outdoors
Heat pumps and hybrid systemsAlongside the existing boilers, where it pays off.

The method

From analysis to completed works, one step at a time

The process is split into modules. After each phase the owners' meeting decides, with the figures in hand: the building only commits to the next step.

The first step

The energy analysis of the building (Module EF)

A technical and economic study of the entire energy system, to identify measures that are feasible and affordable. Fixed lump-sum fee, agreed in advance; delivery within three months of receiving the documents.

EF1 · Current situation

Documents, site visit, energy use and costs, building and systems, critical issues.

EF2 · Solutions

Coordinated preliminary sizing of boilers, heat pumps, photovoltaics and storage; simulation of energy use day by day and season by season.

EF3 · Market check

Preliminary quotes from specialised contractors, to confirm and fine-tune the solution.

EF4 · Final report

Investment, savings, incentives and payback times, presented to the building manager and the owners' meeting.

To get started, all you need is the EF01 form: a few details about the building, used to prepare a tailored quote. Download it and send it here →
← Back to the method

After owners' meeting 1

Tender and contractor selection (Module M1)

From the outline design to the choice of contractor: comparable quotes on the same basis, and a decision taken with the figures in hand. Module M1 can follow Module EF or be commissioned on its own, if the available technical documentation is sufficient.

M1.1 · Technical specification

Preparation of the technical specification and tender documents, based on the EF study or on the available design.

M1.2 · Selection of contractors

Identification of qualified contractors to invite and request for quotes, all based on the same specification.

M1.3 · Managing the tender

Technical contact with the contractors, clarifications, regular updates to the building manager; analysis and comparison of the final quotes.

M1.4 · Selection of the contractor

Technical and commercial negotiation, finalisation of the offer and selection of the proposed contractor, to be presented at owners' meeting 2 with the final cost breakdown.

The result: a finalised offer and a selected contractor, to be presented at owners' meeting 2 with the final cost breakdown of the project. The contract is awarded only after the owners' meeting has approved it. ← Back to the method

After owners' meeting 2

Implementation (Module M2)

From the start of works to commissioning: an engineer on the owners' side, checking that the system is built as planned, on time and on budget.

M2.1 · Contract award and start of works

Award of the contract to the selected company, start of the works and coordination between contractor, building manager and owners.

M2.2 · Design review

Checking that the detailed design prepared by the contractor is consistent with the specification and the contract.

M2.3 · Site supervision

Scheduled site visits, progress monitoring, technical handling of changes and deviations, updates to the owners.

M2.4 · Acceptance and handover

Final inspection of the system and its documentation; support at handover and commissioning.

The detailed design remains the responsibility of the contractor or its designer: Module M2 checks that it matches what was agreed. ← Back to the method

Why a consultant

Three quotes are not enough

Comparable quotes

Every contractor proposes its own system. With a single specification, the bids can be compared on the same basis.

The system, not the single components

Boilers, heat pumps, photovoltaics and storage have to be sized together: that is where the savings come from.

Alongside the building manager

The building manager runs the building; the consultant brings the technical support needed to make good decisions.

The owners have the final say

My job is to put clear figures on the table. The decision always rests with the owners.

Logo Ing. R. de Zuani

About me

Ing. Roberto de Zuani

Aerospace engineer (Sapienza University, Rome), licensed to practise as an engineer in Italy since 1993.

For more than twenty years I have worked in industry, in Italy and Germany, on thermal management, air-conditioning and power electronics, following projects for major European manufacturers from the first quote to series production.

I follow the market for photovoltaics, heat pumps and hybrid systems closely: I know how to request quotes from contractors and how to compare them.

For much of my career I was on the side of those who write the offers: I know how a quote is built, where the margins are hidden and which questions to ask to genuinely compare different proposals. Today I put that experience at the service of apartment buildings – on the client's side.

I handle every assignment personally: analysis, selection of contractors, negotiation, supervision of the works through to final acceptance. I work in Italian, German and English.

Experience and method at the service of your building.

Contact

Let's talk about your building

Building managers and owners' committee members are welcome to contact me for an initial assessment of the building.

Phone
+39 360 601901

Email
info@ing-dezuani.it

Office
Via Giuseppe Valmarana 107 · 00139 Rome, Italy

Getting started: the EF01 form

Fill in only the details you have to hand (for the rest, simply write "Not known") and attach it to your request. Filling it in is not an engagement: it is only used to prepare the quote. The form is in Italian – I am happy to go through it with you.